Hydro Engineering, Inc.

Toll Free: 800-247-8424
In Utah: 801-972-1181
http://www.hydroblaster.com
        

Pick Your Wash Location

portable wash pad, fluid containment, water containment

Pick Your Washing
Location

This alley was the perfect spot. A little clean up and the equipment is ready to be placed.

Setting Pads In Place

portable wash pads, fluid containment, water containment

Set Portable Wash Pads In
Place

As the first pad is placed, a level is taken to ensure that there is about 2' of slope to the side of the Hydropads that the side gutters connect. This gets the water and solids going where they need to go.

These pads were shimmed with a 1X4. Pretty simple!

Side Gutter Placement

portable wash pads, fluid containment, water containment

Lay Out High Solids
Collection Gutters

In this installation, the side gutters were installed against the building. It works perfect because all the wash and water filtration equipment is on the other side of the wall.

Location For Wash and Recycling Equipment

portable wash pads, fluid containment, water containment

Identifiy Equipment
Location

This wall will be cleaned up and the equipment will go right here. The Hydropad in just outside this wall.

Hydroblaster and Hydrokleen

portable wash pads, fluid containment, water containment

Set Equipment In Place

The utilities were already there, 110 volt power and a water supply. The customer already had a pressure washer.

No sewer connection was available so the Hydrokleen recycling system provided for re-use of the wash water.

Up and Washing

portable wash pads, fluid containment, water containment

That's it. Let the washing begin!